top of page

Quad-Arts Tested

  • Writer: M&GN
    M&GN
  • Apr 22, 2008
  • 1 min read

Both portions of the unique Quad-Articulated set No.74 have been reunited for the first time in five years. The two sets of two coaches were connected up and adjusted to ensure all brakes and springs were correctly calibrated and that the set was level. After the last service train the Quad-Arts made a full round trip of the line on a test run, behind Class 25 25057/D5207

ree

ree

ree

ree

bottom of page