• M&GN

WD Tender Update 2017 January

The tender side on landward was very distorted and had been filled with filler at least an inch thick with nails welded on the dimples to give a grip for the filler. This has now had the filler dug out and the sides cut where the dips were the sides pulled out and re-welded to give a flatter surface.






0 views

Registered Charity: 1063676

  • Facebook
  • Twitter
  • YouTube
  • Instagram

Registered Company: 03355411

©2020 Midland and Great Northern Joint Railway Society.

Design and Managed by Norfolk IT Solutions