• M&GN

WD Overhaul Update March 2016

Engine now fully re-wheeled and back down ready for suspension to be reassembled. Good progress is being made with the assembly of the Ikea flat pack ash pan which is being assembled with the assistance of the arc welder.

0 views

Registered Charity: 1063676

  • Facebook
  • Twitter
  • YouTube
  • Instagram

Registered Company: 03355411

©2020 Midland and Great Northern Joint Railway Society.

Design and Managed by Norfolk IT Solutions